Construction Update | November 6, 2026
The Hidden Systems Are in Place
Some of the most important work in a fine home is the work that will soon disappear from view.
At 786 Fairfield Drive, that essential layer is now complete. The electrical and plumbing are installed, the exterior windows are all in place, and the residence stands at the threshold of one of the most transformative stages of any build.
Here's a look at our construction milestones to date:
Milestone 01 | Electrical Installed — Inspection Up Next
All electrical work is now installed throughout the home.
This is where the lighting plan shaped by the designer and electrician begins to become real: the thoughtfully placed switches, the custom LED built-ins, and the dimmable lighting intended to set the mood in every room. Each decision made while the walls stood open is now built into the structure itself.
The next step is the electrical inspection, which is anticipated soon, subject to scheduling.
Milestone 02 | Plumbing Installed
The plumbing is now fully installed, completing the work that began with the rough-in last month.
For a home with five full bathrooms and a powder room, a prep kitchen, and dual laundry, this is no small achievement. It is the unseen infrastructure that will make daily life here feel effortless.
Milestone 03 | All Exterior Windows Installed
Every exterior window is now in place.
With the black casement windows set and the high-quality folding exterior doors already installed, the home's envelope is defined. Daylight now falls into each room exactly as Gotsch Studio intended, offering a true sense of how the interiors will feel.
Milestone 04 | Front Porch Posts Underway
Work continues on the four posts at the front of the home, which frame the covered front porch.
These posts will give the façade its welcoming presence, the first impression every guest will carry through the front door. We look forward to sharing them once they are complete.
What's Next for 786 Fairfield Drive?
Once the electrical inspection is complete, the home is expected to move forward to drywall, subject to construction scheduling and site conditions.
It is a remarkable turning point. Open framing gives way to true rooms, and the proportions of the 12-foot main-level ceilings, the vaulted dining room, and the primary suite will read clearly for the first time.
We'll continue to share every milestone as 786 Fairfield Drive moves steadily toward completion.
Experience the Vision Before It's Complete
There is a rare pleasure in seeing a home before its walls are closed: understanding the care behind every system, and imagining the life that will soon unfold within.
For discerning buyers seeking a new-construction residence in the Indian Hills area of Marietta, 786 Fairfield Drive offers that perspective now.
Private construction previews and additional property information are available upon request, subject to site conditions and safety requirements.
For more photos and listing details: 786-fairfield-dr.mariofox.com
Mario Fox | Global Real Estate Advisor
Atlanta Fine Homes Sotheby's International Realty
📞 678.231.1300
🌐 www.mariofox.com
Extraordinary real estate deserves extraordinary representation.